SUMITOMO

Clean Room, Electrical upgrades for Sumitomo life science facility in San Jose, CA by Elson Electric

LIFE SCIENCE

SUMITOMO

SAN JOSE, CA | 2026

LIFE SCIENCE

SUMITOMO

SAN JOSE, CA | 2026

This tenant improvement project for Sumitomo focused on delivering a complete electrical buildout to support a modern commercial workspace. The scope included installation of new LED lighting systems across multiple fixture types, along with integrated lighting controls, power distribution, and dedicated circuits for equipment and building systems.

Work involved significant electrical infrastructure upgrades, including new panels, transformers, and feeder runs to accommodate expanded load requirements. Coordination with mechanical systems and other trades was essential to align power, lighting, and equipment needs. The result is a flexible, high-performance environment designed to support daily operations and long-term adaptability.

PROJECT TYPE:

LIFE SCIENCE

LOCATION:

SAN JOSE, CA

YEAR:

2026

This tenant improvement project for Sumitomo focused on delivering a complete electrical buildout to support a modern commercial workspace. The scope included installation of new LED lighting systems across multiple fixture types, along with integrated lighting controls, power distribution, and dedicated circuits for equipment and building systems.

Work involved significant electrical infrastructure upgrades, including new panels, transformers, and feeder runs to accommodate expanded load requirements. Coordination with mechanical systems and other trades was essential to align power, lighting, and equipment needs. The result is a flexible, high-performance environment designed to support daily operations and long-term adaptability.

PROJECT TYPE:

LIFE SCIENCE

LOCATION:

SAN JOSE, CA

YEAR:

2026

FULL ELECTRICAL
BUILDOUT

LED LIGHTING
SYSTEMS

POWER
DISTRIBUTION

LIGHTING
SYSTEMS

GALLERY

MORE PROJECTS

Lobby Area, High finish tenant improvements at Pillsbury Law office in Palo Alto, CA by Elson Electric

PILLSBURY LAW

A former bank reimagined into a modern workplace, this Palo Alto headquarters blends architectural lighting, integrated systems, and thoughtful coordination to create a refined environment built for collaboration, flexibility, and everyday performance.
Lobby, Dental facility upgrades and tenant improvements at Willow Glen Dental in San Jose, CA by Elson Electric

WILLOW GLEN DENTAL

Coordinated lighting across treatment and patient spaces brings clarity and consistency to this dental office, supporting both clinical performance and a comfortable, well-balanced environment.
Tenant Improvements at America Center Lobby in San Jose, CA by Elson Electric

AMERICA CENTER LOBBY

At America Center, layered lighting and clean integration come together to redefine the lobby experience, with our team delivering suspended fixtures, linear LEDs, and ceiling systems that bring clarity, balance, and consistency to the space.

LET’S CONNECT

GET TO KNOW OUR TEAM

Whether you’re planning ahead or just exploring options, our team is here to find comprehensive solutions to your needs.

LET’S CONNECT

GET TO KNOW OUR TEAM

Whether you’re planning ahead or just exploring options, our team is here to find comprehensive solutions to your needs.