EXPEDIA

Office lobby with layered halo LED ceiling fixtures and staircase

TENANT IMPROVEMENTS

EXPEDIA

SAN JOSE, CA | 2026

TENANT IMPROVEMENTS

EXPEDIA

SAN JOSE, CA | 2026

This two-level office tenant improvement for Expedia in San Jose started with safe-off and demolition of the existing electrical and lighting systems, then rebuilt power across Levels 2 and 3. Scanning and coring brought new floor power to open work areas, and our crews ran pathways for AV, data, security, and DAS systems throughout, including conduit for card readers.

Beyond the core buildout, the scope covered a lighting package tied into a Lutron Vive wireless control system, with factory-finished white conduit in exposed ceiling areas and a suspended architectural linear fixture assembled on the ground before it was lifted into place. Fire alarm work, UPS terminations, an emergency power-off switch, and Title 24 documentation for each floor completed the job. The result is a workspace where power, lighting, and technology infrastructure were coordinated floor by floor ahead of the office opening in June 2026.

PROJECT TYPE:

TENANT IMPROVEMENTS

LOCATION:

SAN JOSE, CA

YEAR:

2026

This two-level office tenant improvement for Expedia in San Jose started with safe-off and demolition of the existing electrical and lighting systems, then rebuilt power across Levels 2 and 3. Scanning and coring brought new floor power to open work areas, and our crews ran pathways for AV, data, security, and DAS systems throughout, including conduit for card readers.

Beyond the core buildout, the scope covered a lighting package tied into a Lutron Vive wireless control system, with factory-finished white conduit in exposed ceiling areas and a suspended architectural linear fixture assembled on the ground before it was lifted into place. Fire alarm work, UPS terminations, an emergency power-off switch, and Title 24 documentation for each floor completed the job. The result is a workspace where power, lighting, and technology infrastructure were coordinated floor by floor ahead of the office opening in June 2026.

PROJECT TYPE:

TENANT IMPROVEMENTS

LOCATION:

SAN JOSE, CA

YEAR:

2026

TWO-LEVEL
OFFICE TI

TWO-LEVEL
OFFICE TI

LUTRON VIVE
CONTROLS

LUTRON VIVE
CONTROLS

AV & DATA
PATHWAYS

AV & DATA
PATHWAYS

FIRE ALARM
SYSTEMS

FIRE ALARM
SYSTEMS

GALLERY

GALLERY

MORE ON THIS PROJECT

FIND MORE ON LINKEDIN

Check out what we’ve posted about this project and stay updated on what we’re working on next.

MORE ON THIS PROJECT

FIND MORE ON LINKEDIN

Check out what we’ve posted about this project and stay updated on what we’re working on next.

LET’S CONNECT

GET TO KNOW OUR TEAM

Whether you’re planning ahead or just exploring options, our team is here to find comprehensive solutions to your needs.

LET’S CONNECT

GET TO KNOW OUR TEAM

Whether you’re planning ahead or just exploring options, our team is here to find comprehensive solutions to your needs.